1 trolley PTFE sintering furnace insulation properties, the furnace temperature uniformity, set any sintering curve, in the same time, the same temperature value. Furnace temperature error is ± 1 ℃, 1000 hours of operation without time error.
2 stainless steel chamber lining and dial, never rust.
Exhaust purification by activated carbon treatment after discharge pipe, pollution, environmental performance.
Single set of program-controlled sintering Muffle furnace: the preparation of any sintering curve by the sintering process, the device is activated, the rise time and temperature, holding time and temperature constant value characteristics.
Group program-controlled sintering furnace: You can also be incorporated into the sintering curve, according to the the product sintered requirements at any time call.
Network multiple sets of program-controlled sintering furnace: no paper record, may have an infinite set of programming. Record sintering file that can be sustained for one year. Can achieve the sintering furnace running at the same time, and remote control.
Drying furnace applications: from the raw material morphology centrifuge cake; freely flowing powder. Granules, flakes, fibers and other materials dry. From the drum dryer mechanism can be divided into direct or indirect heating, ventilation tube heating steam pipe indirect heating, double heating and other structural forms. From the drying temperature may be from 60 ° -600 ° range of choice, in principle the higher the temperature, the higher the evaporation intensity.
2013年9月11日星期三
2013年7月1日星期一
Furnace charging into the furnace and power transmission
First, the charge into the furnace:
Charge into the blast furnace, electric furnace steelmaking operations plan should be based on the ingredients in a single audit charge weight and alloy elements and ingredients and feed weight pad in the bottom 1 to 2% of lime.
Top loading baskets have someone directing, opened the lid, it should promptly baskets hanging into the center of the furnace may not be too high, too biased and too low. In baskets of chain plate is not bad as far as sticky lower. For the second feeding, not other primary materials entirely of clear before feeding, to avoid spraying and splashing of molten steel, but also to prevent the explosion, humid charge non-loading of the material into several baskets.
After charging into the furnace, for excessive burden should flatten or hanging out, so as not to affect the fastening lid while preventing the lid was arcing and leakage.
Second, the power transmission:
Charge into the furnace after the power transmission before the deal lid, electrodes, cooling system, mechanical transmission, electrical equipment, etc. for inspection, if found to be timely treatment failure, resulting in the smelting process in order to avoid downtime; also check the charge with the door or cooling system is touching, if exposed to immediately exclude, in order to avoid transmission after breakdown.
If the electrode is not long enough, it is best replaced before the transmission, such as loose fitting location, should be tightened in order to facilitate a Chuanjing success, reducing downtime caused by the phenomenon of the smelting process.
Charge into the blast furnace, electric furnace steelmaking operations plan should be based on the ingredients in a single audit charge weight and alloy elements and ingredients and feed weight pad in the bottom 1 to 2% of lime.
Top loading baskets have someone directing, opened the lid, it should promptly baskets hanging into the center of the furnace may not be too high, too biased and too low. In baskets of chain plate is not bad as far as sticky lower. For the second feeding, not other primary materials entirely of clear before feeding, to avoid spraying and splashing of molten steel, but also to prevent the explosion, humid charge non-loading of the material into several baskets.
After charging into the furnace, for excessive burden should flatten or hanging out, so as not to affect the fastening lid while preventing the lid was arcing and leakage.
Second, the power transmission:
Charge into the furnace after the power transmission before the deal lid, electrodes, cooling system, mechanical transmission, electrical equipment, etc. for inspection, if found to be timely treatment failure, resulting in the smelting process in order to avoid downtime; also check the charge with the door or cooling system is touching, if exposed to immediately exclude, in order to avoid transmission after breakdown.
If the electrode is not long enough, it is best replaced before the transmission, such as loose fitting location, should be tightened in order to facilitate a Chuanjing success, reducing downtime caused by the phenomenon of the smelting process.
订阅:
博文 (Atom)

